skip to main
|
skip to sidebar
LA MUSEUM OF THE HOLOCAUST
Friday, January 8, 2010
Roofscapes, Inc. Final Drawings
These are the final drawings minus the roof plan, which we are editing to match the drawing that shows the depth of material at the DG walkway.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
CONFERENCE CALL
Day and Time TBA
Call Number 218.339.2622
Access Code: 662677#
Labels
3-D model
(2)
concept
(4)
construction documents
(5)
construction photos
(2)
Design
(7)
drainage
(1)
gardens
(1)
Grass 07-29-10
(1)
history
(1)
meeting agenda
(4)
meeting minutes
(6)
Monument Plaza
(1)
Plants
(2)
Roof Beam Clarification Plan
(1)
Roof Photos from 10-0217
(1)
Roof photos from 10-0603
(1)
Roof photos from 10-0624
(1)
Roof Photos from 12-05
(1)
Scope
(4)
site photos
(3)
technical
(29)
Links
BELZBERG
LA MOTH
Blog Archive
►
2011
(1)
►
February
(1)
▼
2010
(21)
►
December
(1)
►
July
(1)
►
June
(2)
►
April
(1)
►
March
(2)
►
February
(4)
▼
January
(10)
more construction photos 01/15/10
No title
construction photos 01/15/10
Final Board Presentation
Revised Roofscsapes, Inc. Roof Plan
Roofscapes, Inc. Final Drawings
Pathway Material Depths
Action Items:
meeting agenda
Final Plant Pallet and Color Study
►
2009
(77)
►
December
(27)
►
November
(33)
►
October
(14)
►
July
(1)
►
June
(2)
No comments:
Post a Comment